Sign up to receive a text message or email when new bids are added!
Bid Number: 219-393
Bid Title: Hillyer St. Sidewalk & ADA Ramp Project
Category: Construction Services, Heavy, Including Maintenance and Repair Services
Status: Closed

Description:
The successful vendor will provide all labor, equipment, tools, materials, supplies, supervision, and other
items or services necessary to install 2970 SF of new 5 ft. sidewalk, and 3 ADA ramps. Contractor will be responsible
for the following: install temporary erosion control, excavate for sidewalk and ADA ramps, Form and Pour Sidewalk,
Form and Pour ADA ramps, Backfill.
This project is located over the Edwards Aquifer Recharge Zone and an approved WPAP has been issued. Erosion
controls will be installed before beginning any excavation. The City will install permanent erosion controls after the
project is complete. The City will install permanent erosion controls after the project is complete.
Any patching of the asphalt will be subsidiary to the installation of the curb. Work will be completed within 21
calendar days from the start date.
Publication Date/Time:
8/20/2019 4:00 PM
Closing Date/Time:
9/3/2019 2:00 PM
Related Documents:
View Document(s)

Return To Main Bid Postings Page