Hopkins Street - Bishop to Moore Improvements

Hopkins Street Schedule - 

  • Construction Start – Winter 2019
  • Duration – 18 months
  • Estimated Cost - $8.5 million

Open House Roadway Exhibit (PDF)

Open House Exhibit Boards (PDF)

Open House Informational Brochure (PDF)

Open House Meeting Notice - July 24, 2018 at Dunbar Recreation Center (PDF)

The Hopkins Street Improvements from Bishop to Moore Streets will replace existing water and wastewater infrastructure, add a drainage system to improve storm water runoff, and reconstruct the street with curbs and sidewalks.

Improvement rendering of street scene

Design Process

The City of San Marcos is in the design process to reconstruct Hopkins Street between Moore and Bishop Streets, and to identify ways to improve drainage in the neighborhood.

Approach

A "Complete Street" approach will be used in the design of Hopkins Street, with considerations to:

  • Existing heritage trees
  • Pedestrian and bicycle traffic
  • Streetscape and gateway elements to enhance the historic neighborhood
  • Traffic calming
  • Utility considerations

Drainage

Drainage in the neighborhood will be analyzed to determine needed upgrades in the system.