Loop 82 and Bobcat Stadium RRFB

  • This project includes the installation of a rectangular rapid flashing beacon (RRFB) with all associated apparatuses at the intersection of Loop 82 and Bobcat Stadium Driveway.

 

  • A traffic signal warrant study was conducted by HDR Engineering in 2018 which consisted of data collection, field investigation and warrant analysis.  Based on the analysis and the significant pedestrian traffic crossing Loop 82 frontage roads, installation of a rectangular rapid flashing beacon will be installed.

 

  • Construction Estimate - $68,072.37

 

  • Construction Start – June 2021

 