Linda Drive Improvements

This project includes:

  • Replacement of approximately 7,000 feet of sewer main from the City’s main lift station off River Road along Linda Drive northeast to near the McCoy’s headquarters building. This sewer has deteriorated and needs to be replaced.
  • Water system improvements to up-size existing water mains along Linda Drive and complete a loop at Bugg Lane to improve system reliability 
  • Construction of underground conduits and vaults along Linda Drive for future conversation of electric overhead to underground within the Blanco Gardens neighborhood

Project Status and Schedule

  • Preliminary engineering complete
  • 60 percent designs in progress
  • Construction is scheduled for FY 2022 at an estimated cost of $7.5M
  • Design includes replacement of the wastewater line from Highway 80 to Davis Lane which is scheduled for construction in FY 2023